ARK Equipment Helps Balance The Commercial Power Grid in Poland

Views: 0     Author: Site Editor     Publish Time: 2025-01-17      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

1.Project background

In this dynamic land of Poland, its unique business culture is closely intertwined with thriving economic activity. Poland's business environment is very distinctive, the old city square surrounded by modern large shopping centers, Gothic and Baroque architecture style buildings, all kinds of cutting-edge technology products shops, traditional handicrafts shops and specialty food restaurants. The power supply stability of these commercial places is directly related to the creation of their unique business atmosphere and the smooth development of economic activities. However, the problem of three-phase imbalance is like a hidden "electric tiger" in the dark, threatening this commercial prosperity.

Commercial electricity consumption in Poland is characterized by complexity and diversity. In a large commercial complex in Warsaw, it not only gathers fashion brands from around the world, but also has a local amber craft shop and Krakow style restaurant. Inside the complex, a large number of different types of electrical equipment operate simultaneously. Central air conditioning systems create a comfortable shopping environment for customers, industrial production machinery ensures the operation of some on-site production workshops, and gorgeous lighting and frequent operation of elevator equipment, so that the power demand is constantly changing. The use time and power requirements of these devices vary greatly, just as notes of different rhythms are difficult to harmoniously resonate in the same melody, resulting in an imbalance of three-phase loads.


2.ARK's solution

Before the ARK compensation equipment is introduced, the three-phase current monitoring data of this commercial system is worrying. During peak hours, the pressure on public transformers (10kV/380V) is beyond imagination. The current in phase B is like a wild horse, soaring to 149.5A, while the current in phase C is a snail's pace, only 13.1A. Such a huge current difference makes the transformer overwhelmed. The strong abnormal noise emitted by the transformer echoed in the commercial corridor full of Polish characteristics, not only breaking the original elegant shopping atmosphere, but also indicating that the internal structure is suffering from the powerful electromagnetic force impact caused by the unbalanced current. This is like a strong castle under constant artillery attack, long-term accumulation will greatly increase the risk of equipment failure. Once the power outage, it will be a huge disaster for this commercial complex with many businesses. Not only the turnover of the day will be hit hard, but also the loss of customers may cause irreparable loss of business reputation. At the same time, the excessive current imbalance causes the transformer loss to rise sharply, and a large amount of electric energy is wasted into heat energy. This not only reduces energy efficiency, but also leaves businesses paying higher electricity bills, squeezing their already limited profit margins.

In order to overcome this problem, ARK has deeply studied the characteristics of commercial electricity consumption in Poland, and with its deep technical accumulation and innovative research and development capabilities, it has specially customized three-phase unbalance compensation equipment suitable for the needs of commercial customers in Poland. ARK's team of professionals crisscrosses the streets of Poland, conducting in-depth and detailed on-site surveys of various commercial venues. They not only record electricity data, but also understand the unique hours and usage habits of Polish business operations. After accurate power data analysis, a 75A ARK three-phase unbalance compensation device was installed for the commercial customer.

This advanced device integrates cutting-edge intelligent control algorithms with ultra-precise current detection technology to monitor subtle changes in three-phase current in real time. Once the unbalanced current signal is captured, the device automatically starts an efficient compensation procedure. It uses advanced power electronics technology to quickly and accurately deploy reactive power between the three phases, dynamically and accurately adjust the current size of each phase, and ensure that the three-phase current quickly returns to the balance state.


3.Project outcome

After the successful installation of ARK equipment, the three-phase current of the commercial system was fully monitored again, and the results were satisfactory, and the three-phase current was stabilized in a state of equilibrium. This strongly proves that ARK equipment has a significant effect in reducing the three-phase load imbalance of public transformers, and successfully eliminates the single-phase overload hidden danger caused by load imbalance. The noise of the transformer was quickly reduced to the normal level, and the original noisy business environment was restored to the vitality of the past. Customers shop in a peaceful atmosphere, enjoy Polish amber crafts and taste the delicious Krakow cuisine. At the same time, the transformer loss is greatly reduced, and the energy transmission efficiency is significantly improved, which saves considerable electricity costs for commercial customers. Merchants can use the money saved to upgrade their stores or expand their businesses, further promoting the prosperity of Polish business.

Looking to the future, with the continued prosperity of Polish business and the further growth of electricity demand, ARK will always maintain a leading position in technological innovation and continue to optimize and upgrade product performance. ARK is determined to become a solid guardian of commercial power in Poland, to provide more Polish business customers with customized, high-efficiency power solutions, and help Polish business shine more brightly under the stable power protection.

advanced static var generator


Quick Links

Products

Contact

Tel: +86-(0)25-56601542
E-mail: info@cnarktech.com
Add: Room 206, 2nd Floor, Building #31, ABP, No.70 Phoenix Road, Jiangning District, Nanjing, Jiangsu, China.

Follow Us

Copyright © 2023 cnarktech.com All Rights Reserved.    Jiangsu ICP 20010870号-1
Privacy PolicySiteMap | Support By Leadong