Successful Application of 250kW-500kW PCS in Industrial Parks in France

Views: 0     Author: Site Editor     Publish Time: 2024-12-24      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

The Customer Park is a comprehensive park that gathers many industrial enterprises, covering many industries such as machinery manufacturing, electronic processing, and chemical industry. With the continuous development and expansion of enterprises in the park, higher requirements are put forward for the stability, efficiency and intelligent energy management of power supply. In order to reduce operating costs, improve energy self-sufficiency and practice the concept of sustainable development, some enterprises in the park have plans to introduce distributed energy resources, such as solar photovoltaic systems and small wind power plants. However, the electricity generated by these distributed energy sources is intermittent and volatile, and it is difficult to achieve seamless docking with the traditional power grid of the park, and efficient power conversion and regulation equipment is needed to ensure the stable integration and distribution of electric energy. Under the traditional power supply mode, the park lacks effective energy management means, which makes it difficult to monitor, analyze and regulate the power consumption of each enterprise in real time. It is difficult to accurately grasp the distribution of energy consumption and peak and trough periods of electricity consumption, and it is difficult to formulate reasonable energy procurement and distribution strategies, resulting in serious energy waste and low overall energy utilization efficiency. In order to meet the above challenges, the park management side evaluated and selected 250kW-500kW PCS products from ARK company after various evaluation and screening, and built an advanced distributed energy management and power quality optimization system. ARK PCS has excellent bidirectional power conversion function, which can efficiently convert the direct current generated by distributed energy sources (solar photovoltaic panels, small wind turbines, etc.) in the park into alternating current that meets the requirements of the grid, and can flexibly realize the bidirectional flow of electric energy according to the real-time demand and energy storage status of the grid. When there is a surplus of distributed energy generation, PCS stores the excess energy into the energy storage system. When the demand for electricity in the park increases or distributed energy generation is insufficient, it can quickly release energy from the energy storage system or supplement energy from the grid to ensure the continuity and stability of power supply. For example, in the sunny day, the solar photovoltaic system generates a large amount of power, PCS can give priority to most of the photovoltaic energy for the use of enterprises in the park, and store the remaining part in the energy storage battery; At night or on cloudy days, when the power generation of the photovoltaic system is reduced, PCS obtains electricity from the energy storage system or the grid to meet the electricity demand of the park. Through this intelligent control method, the optimal allocation and efficient utilization of energy in the park are realized. ARK 250kW-500kW PCS is equipped with a powerful energy management and monitoring software system, which can be seamlessly integrated with various smart meters, sensors and production management systems in the park. Through real-time collection and analysis of power consumption data, distributed energy generation data and power system operation parameters of each enterprise in the park, it provides a comprehensive and accurate visual interface of energy information for the park management. With the help of this platform, the management side can grasp the energy consumption dynamics, power quality status and the power load distribution of each enterprise in the park in real time, so as to formulate scientific and reasonable energy management strategies, such as time-of-use tariff policy and energy distribution optimization plan, effectively guide enterprises to use electricity reasonably and reduce the overall energy consumption of the park.

power conversion system

Quick Links

Products

Contact

Tel: +86-(0)25-56601542
E-mail: info@cnarktech.com
Add: Room 206, 2nd Floor, Building #31, ABP, No.70 Phoenix Road, Jiangning District, Nanjing, Jiangsu, China.

Follow Us

Copyright © 2023 cnarktech.com All Rights Reserved.    Jiangsu ICP 20010870号-1
Privacy PolicySiteMap | Support By Leadong